HVAC team installs a new chiller
U.S. Air Force Senior Airman Henry Alexander 355th Civil Engineer Squadron heavy equipment operator, directs a crane operator during the positioning of new chiller at Davis-Monthan Air Force Base, Ariz., Jan. 30, 2018. The installation of a new chiller was necessary after the previous one at the 563rd Operational Support Squadron sustained total damage. With the help of the Dirt Boyz, the HVAC team were able to install a brand new chiller, ensuring the 563rd OSS never experienced a lapse in mission readiness. (U.S. Air Force photo by Senior Airman Cheyenne A. Powers)
PHOTO BY:
Senior Airman Cheyenne A. Powers
VIRIN:
180130-F-PB513-040.JPG
FULL SIZE:
0.78 MB
CAMERA
N/A
LENS
N/A
APERTURE
N/A
No camera details available.
IMAGE IS PUBLIC DOMAIN
Read More
This photograph is considered public domain and has been cleared for release.
If you would like to republish please give the photographer appropriate credit.
Further, any commercial or non-commercial use of this photograph or any other
DoD image must be made in compliance with guidance found at
https://www.dimoc.mil/resources/limitations,
which pertains to intellectual property restrictions (e.g., copyright and
trademark, including the use of official emblems, insignia, names and slogans), warnings
regarding use of images of identifiable personnel, appearance of endorsement, and related matters.